CPF Badra Oil Field Camp and Camp Infrastructure Project

Client: Samsung (July 2013)
Location: Badra/Kut
Planned Duration: 12 Months
Actucal Duration: 12 Months

Project is Engineering, Procurement & Commissioning Of all infrastructure of a roughly 4000 people Camp, this to include the following :-

  • Sewer Network and Sewer Treatment Plant
  • Water Network and Water Treatment Plant
  • Electrical Network, and Power Generation
  • Strom Water Network, Roads, Parking area and Walkways
  • Supply and Installation of VIP Suits (Prefabricated Units)