Started in early 2004, as a Main Sub-contractor for Bechtel/Parsons, in Baghdad’s most congested and populated area “Al-Zafaranyah”. The project was to build a large Trunk Line Sewer with Pump Station, Funded by USAID.
The Project was completed successfully in Mid 2006, Known for high quality construction and safety standards. Kufan’s reputation started right there, and the story continued.
Main areas of Infrastructure Solutions :-
- Water & Waste Water Networks
- Electrical (Sub-Stations, And Transmission Lines)
- Roads and Bridges
Many projects were completed successfully for Kufan’s Infrastructure, to name few :-
1.EPC Contract, Al-Zafaranyah Trunk Line Sewer - Baghdad
2.EPC Contract, Al-Abbas Combined Sewer Network – Basra
Construction & Commissioning Of 7 Substations (Badra Oil Field)
EPC Contract, Al–Zafaranyah Trunk line Sewer - Baghdad
Client : USAID / Bechtel / Parsons
![Image166 Image166](https://kufan-group.com/wp-content/uploads/bb-plugin/cache/image166-landscape-eeddbbcc29afb7dbd4dbf0917bb12f30-5c4fb91b0b224.png)
![Image167 Image167](https://kufan-group.com/wp-content/uploads/bb-plugin/cache/image167-landscape-aa050beb65c7becff77ecfdc01ef4671-5c4fb91b0b262.png)
![Image168 Image168](https://kufan-group.com/wp-content/uploads/bb-plugin/cache/image168-landscape-4a44fa80489349d7799c4ada6fde6390-5c4fb91b0b29c.png)
EPC Contract, Al–Abbas Combined Network - Basrah
Client : US Army Corp Of Engineers
![Image171 Image171](https://kufan-group.com/wp-content/uploads/bb-plugin/cache/image171-landscape-18fb0b38e7cf0016ef4cfe9ce8fa96ca-5c4fd0e90c771.png)
![Image172 Image172](https://kufan-group.com/wp-content/uploads/bb-plugin/cache/image172-landscape-40e9fb3b987290191f3b79bc477df4b2-5c4fd0e90c7e1.png)
![Image173 Image173](https://kufan-group.com/wp-content/uploads/bb-plugin/cache/image173-landscape-26456f51fcb5857bea211596b86920fa-5c4fd0e90c858.png)
![Image174 Image174](https://kufan-group.com/wp-content/uploads/bb-plugin/cache/image174-landscape-860e509644d5515131a88383829fca67-5c4fd14fa4bd7.png)
![Picture2 Picture2](https://kufan-group.com/wp-content/uploads/bb-plugin/cache/Picture2-1-landscape-19c54ecf6949ce59c4c069ece418008d-5c4fd14fa4c0f.png)
![Picture1 Picture1](https://kufan-group.com/wp-content/uploads/bb-plugin/cache/Picture1-1-landscape-0e7a764016487f58eea3e316c31ac70a-5c4fd14fa4c48.png)
EPC Contract, \Construction and Commissioning of 7 Sub-Stations
Client : Gazprom Neft / Samsung Engineering
![Image177 Image177](https://kufan-group.com/wp-content/uploads/bb-plugin/cache/image177-landscape-0690405e4be983c870de8fd27ac7c0f3-5c4fd1ce0c767.png)
![Image178 Image178](https://kufan-group.com/wp-content/uploads/bb-plugin/cache/image178-landscape-afda98f340da8da3fff69bd5a801fb3d-5c4fd1ce0c79f.png)
![Image179 Image179](https://kufan-group.com/wp-content/uploads/bb-plugin/cache/image179-landscape-06453e13e67adbd98271cfec29972cdb-5c4fd1ce0c7d8.png)
![Image46 Image46](https://kufan-group.com/wp-content/uploads/bb-plugin/cache/image46-1-landscape-42d26da7d5d6e2039334ed5d15d28dea-5c4fd22880ede.jpg)