Man Camps

EPC Al-Zaferaniyah Gravity Trunk line Sewer-Baghdad

Work included installation of 5km of trunk line sewer, GRP Pipe of sizes from 900mm – 2100mm – starting depth is 4M depth, final depth is 11.5m (Gravity Line) –…

Read More

EPC HWAK Base Project

EPC Of New Iraqi Air Force Main HQ Building (Senior Officers 3-Story office Building) EPC Officers Building 2 Story EPC Of Accommodation Barracks Complex (1 Senior Officer Accm Bldg, 2…

Read More

Rehabilitation and EPC LUKOIL Head Quarter (International Zone – Baghdad)

Renovate and redesign two villas in Baghdad to become LUKOIL branch office in Baghdad. The work include Civil, HVAC, Fire alarm, Plumbing, Electrical, IT system, CCTV and Security Equipment and…

Read More

Shatt Al Arab Hotel

The project consists of 11 stories hotel building, 8 villas with two stories and 3 stories shopping mall. Kufan scope of work was to handle concrete form work of Shopping…

Read More

IZ Health and Sciences Academy

Work included the design and construction of a single story building to serve as the Iraqi Academy for Health & Science.

Read More

Qadasiyah Explosive Ordnance Disposal Facility

Kufan was hired to design and construct an Explosive Ordnance Disposal (EOD) compound in Diwaniyah that will serve as a provincial headquarters for ordnance and bomb disposal.

Read More

Al Wazeriya National Training Center / Ministry Of Electricity

Work includes the design and construction of a 2 story building to serve as a state-of the-art training center  with a total building area of 11,000 SM for the Ministry…

Read More

Al Ma’moon Exchange & Telecommunication Center (Iraq’s Ministry Of Communication HQ)

Work includes the design and construction of a number of facilities that are: Design and Construction of a high profile 8 story building (the Main HQ Of Ministry Of Communication) Design…

Read More

CPF Badra Oil Field Camp and Camp Infrastructure Project

Project is Engineering, Procurement & Commissioning Of all infrastructure of a roughly 4000 people Camp, this to include the following :- Sewer Network and Sewer Treatment Plant Water Network and…

Read More

Weatherford Camp – Um Qasr, (July 2012)

A fast track project (work was around the clock on three shifts) to accommodate 15 VIP, 100 Technicians & there security personnel in 120 days. Work included Design, Supply, Construction…

Read More