Man Camps
EPC Al-Zaferaniyah Gravity Trunk line Sewer-Baghdad
Work included installation of 5km of trunk line sewer, GRP Pipe of sizes from 900mm – 2100mm – starting depth is 4M depth, final depth is 11.5m (Gravity Line) –…
Read MoreEPC HWAK Base Project
EPC Of New Iraqi Air Force Main HQ Building (Senior Officers 3-Story office Building) EPC Officers Building 2 Story EPC Of Accommodation Barracks Complex (1 Senior Officer Accm Bldg, 2…
Read MoreRehabilitation and EPC LUKOIL Head Quarter (International Zone – Baghdad)
Renovate and redesign two villas in Baghdad to become LUKOIL branch office in Baghdad. The work include Civil, HVAC, Fire alarm, Plumbing, Electrical, IT system, CCTV and Security Equipment and…
Read MoreShatt Al Arab Hotel
The project consists of 11 stories hotel building, 8 villas with two stories and 3 stories shopping mall. Kufan scope of work was to handle concrete form work of Shopping…
Read MoreIZ Health and Sciences Academy
Work included the design and construction of a single story building to serve as the Iraqi Academy for Health & Science.
Read MoreQadasiyah Explosive Ordnance Disposal Facility
Kufan was hired to design and construct an Explosive Ordnance Disposal (EOD) compound in Diwaniyah that will serve as a provincial headquarters for ordnance and bomb disposal.
Read MoreAl Wazeriya National Training Center / Ministry Of Electricity
Work includes the design and construction of a 2 story building to serve as a state-of the-art training center with a total building area of 11,000 SM for the Ministry…
Read MoreAl Ma’moon Exchange & Telecommunication Center (Iraq’s Ministry Of Communication HQ)
Work includes the design and construction of a number of facilities that are: Design and Construction of a high profile 8 story building (the Main HQ Of Ministry Of Communication) Design…
Read MoreCPF Badra Oil Field Camp and Camp Infrastructure Project
Project is Engineering, Procurement & Commissioning Of all infrastructure of a roughly 4000 people Camp, this to include the following :- Sewer Network and Sewer Treatment Plant Water Network and…
Read MoreWeatherford Camp – Um Qasr, (July 2012)
A fast track project (work was around the clock on three shifts) to accommodate 15 VIP, 100 Technicians & there security personnel in 120 days. Work included Design, Supply, Construction…
Read More- « Previous
- 1
- 2
- 3
- Next »