EPC Al-Zaferaniyah Gravity Trunk line Sewer-Baghdad
Work included installation of 5km of trunk line sewer, GRP Pipe of sizes from 900mm – 2100mm – starting depth is 4M depth, final depth is 11.5m (Gravity Line) – 40 large collector manholes. Kufan employed state-of-art techniques in trench shoring, and dewatering techniques.
Read MoreEPC HWAK Base Project
EPC Of New Iraqi Air Force Main HQ Building (Senior Officers 3-Story office Building) EPC Officers Building 2 Story EPC Of Accommodation Barracks Complex (1 Senior Officer Accm Bldg, 2 Officers Accm Bldg, & 4 large two story soldiers Accm Bldg) EPC Of the Commander Unit The work also includes the HVAC, Fire fighting, CCTV…
Read MoreRehabilitation and EPC LUKOIL Head Quarter (International Zone – Baghdad)
Renovate and redesign two villas in Baghdad to become LUKOIL branch office in Baghdad. The work include Civil, HVAC, Fire alarm, Plumbing, Electrical, IT system, CCTV and Security Equipment and entry checks.
Read MoreShatt Al Arab Hotel
The project consists of 11 stories hotel building, 8 villas with two stories and 3 stories shopping mall. Kufan scope of work was to handle concrete form work of Shopping Mall, and the first two story of the Hotel.
Read MoreIZ Health and Sciences Academy
Work included the design and construction of a single story building to serve as the Iraqi Academy for Health & Science.
Read MoreQadasiyah Explosive Ordnance Disposal Facility
Kufan was hired to design and construct an Explosive Ordnance Disposal (EOD) compound in Diwaniyah that will serve as a provincial headquarters for ordnance and bomb disposal.
Read MoreAl Wazeriya National Training Center / Ministry Of Electricity
Work includes the design and construction of a 2 story building to serve as a state-of the-art training center with a total building area of 11,000 SM for the Ministry of Electricity.
Read MoreAl Ma’moon Exchange & Telecommunication Center (Iraq’s Ministry Of Communication HQ)
Work includes the design and construction of a number of facilities that are: Design and Construction of a high profile 8 story building (the Main HQ Of Ministry Of Communication) Design & Construction of 2 stories Post Office Building Design & Construction of 4 stories Car Park and The project was considered as one of the…
Read MoreCPF Badra Oil Field Camp and Camp Infrastructure Project
Project is Engineering, Procurement & Commissioning Of all infrastructure of a roughly 4000 people Camp, this to include the following :- Sewer Network and Sewer Treatment Plant Water Network and Water Treatment Plant Electrical Network, and Power Generation Strom Water Network, Roads, Parking area and Walkways Supply and Installation of VIP Suits (Prefabricated Units)
Read MoreWeatherford Camp – Um Qasr, (July 2012)
A fast track project (work was around the clock on three shifts) to accommodate 15 VIP, 100 Technicians & there security personnel in 120 days. Work included Design, Supply, Construction & Facility Management to include the following :- Construction of 2 Accommodation Quarters (15 VIP Suits & 100 Single Bed Rooms & 10 Double Bed…
Read More