EPC Al-Zaferaniyah Gravity Trunk line Sewer-Baghdad

Work included installation of 5km of trunk line sewer, GRP Pipe of sizes from 900mm – 2100mm – starting depth is 4M depth, final depth is 11.5m (Gravity Line) – 40 large collector manholes. Kufan employed state-of-art techniques in trench shoring, and dewatering techniques.

Read More

EPC HWAK Base Project

EPC Of New Iraqi Air Force Main HQ Building (Senior Officers 3-Story office Building) EPC Officers Building 2 Story EPC Of Accommodation Barracks Complex (1 Senior Officer Accm Bldg, 2 Officers Accm Bldg, & 4 large two story soldiers Accm Bldg) EPC Of the Commander Unit The work also includes the HVAC, Fire fighting, CCTV…

Read More

Shatt Al Arab Hotel

The project consists of 11 stories hotel building, 8 villas with two stories and 3 stories shopping mall. Kufan scope of work was to handle concrete form work of Shopping Mall, and the first two story of the Hotel.

Read More

CPF Badra Oil Field Camp and Camp Infrastructure Project

Project is Engineering, Procurement & Commissioning Of all infrastructure of a roughly 4000 people Camp, this to include the following :- Sewer Network and Sewer Treatment Plant Water Network and Water Treatment Plant Electrical Network, and Power Generation Strom Water Network, Roads, Parking area and Walkways Supply and Installation of VIP Suits (Prefabricated Units)

Read More

Weatherford Camp – Um Qasr, (July 2012)

A fast track project (work was around the clock on three shifts) to accommodate 15 VIP, 100 Technicians & there security personnel in 120 days. Work included Design, Supply, Construction & Facility Management to include the following :- Construction of 2 Accommodation Quarters (15 VIP Suits & 100 Single Bed Rooms & 10 Double Bed…

Read More